"> KSVA pumps are vertical, two -body, sectional, with the inner body, with the end seal of the end type. The support of the rotor is the lower hydrostatic sliding bearing operating on the pumped medium, and the upper adversar-assembly bearing with a crankcase with crankcase oil grease.
"> Designation | "> The purpose of the equipment | ">"> ">"> Technical characteristics | "> Security class / Category of seismic resistance / climatic performance | TR>||
---|---|---|---|---|---|
Feed, m3/h | Ples, m | Type and parameters of the drive | TR>|||
KSVA 650-135-1 TD> | To pump the condensate of the spent steam of stationary steam turbines and condensate of heating steam from the heat exchanging devices of the energy blocks of nuclear power plants and thermal power center | 650 | 135 | Electric motor n = 1480 rpm n dv. = 500 kW U = 6000 in |
-/-/UHL4 |
TR>
KCBA 650-135-2 TD> | For pumping condensate of a heating steam from PND-4 and SPP turbine units of nuclear power plants with VVER-91 reactors TD> | 650 | 135 | Electric motor n = 1485 rpm n dv. = 500 kW U = 6000 in |
4n/II/m3 |
TR>
KSVA 650-135-3 TD> | For pumping the condensate of the heating steam from the PND-4 and SPP of the K-1000-60/3000-2 NPP blocks with the VVER-1000 and serves as a drain pump unit TD> | 663 | 141 | Electric motor n = 1489 rpm n dv. = 400 kW U = 6000 V TD> |
3/IIB/TV3 |
TR>
KSVA 650-135-4 TD> | For pumping from the PND-4 condensate collection, a mixture of the SPP separat and a heating steam from the PND-4 and its rolling into the deaerator of the K-1000-60/3000-3 nuclear power plant | 582 | 146 | Electric motor n = 1485 rpm n dv. = 400 kW U = 10,000 in |
3N/IIB/TV4 |
TR>
KSVA 650-135-5 TD> | To pump the separated steam separated steam after the CVD in the main condensation line after the K-1000-60/1500-2M and K-1100-60/1500-2M turbocharges with the VVER-1000 reactor and serves as a drain pump unit | 650 | 135 | Electric motor n = 1485 rpm n dv. = 400 kW U = 6000 V TD> |
3/II/UHL4 |
TR>
KSVA 650-135-6 TD> | For pumping a separat and condensate entering a separatic collector (SS), and water supply to the PND-4 main condensate tract and then to the K-1200-6.8/50 turbine dearator with reactor & nbsp; & nbsp; Installation of VVER-1200 of the NPP project 2006 | 663 | 141 | Electric motor n = 1500 rpm n dv. = 400 kW U = 10,000 in |
3/II/UHL3.1 |
TR>
KCBA 650-135-7 TD> | For pumping a separat and condensate from a separatic collector (SS) to the main condensate tract for the PND-4 and then to the K-1200-6.8/50 blocks of the Leningrad NPP, NPP 2006 TD>. | 663 | 141 | Electric motor n = 1500 rpm n dv. = 400 kW U = 10,000 in |
4/II/UHL4 |
TR>
KCBA 650-135-8 TD> | For pumping a separat and condensate from the separatos-nickname (SS) to the main condensate tract for the PND-4 and then to the K-1200-6.8/50 turbine dearator as part of the power unit with the VVER-1200 reactor installation at the Belarusian nuclear power plant NPP 2006. | 663 | 141 | Electric motor n = 1500 rpm n dv. = 400 kW U = 10,000 in |
4/II/UHL4 |
TR>